There are different structures for a final year project report, but good ones should always follow a format similar to the following:
Table of Content
Title Page
Approval Page
Table of Content
Dedication
Acknowledgment
Abstract
CHAPTER ONE
1.1 Introduction
1.2 Statement of the problem
1.3 Purpose of the study
1.4 Significance of the study
1.5 Aims and objectives of the study
1.6 Scope of the project
1.7 Constraints and limitations
1.8 Definition of terms
CHAPTER TWO
Literature review
CHAPTER THREE
System analysis and design
3.1 Introduction
3.2 System analysis
3.2.1 Detailed definition of the problem
3.2.2 Feasibility study
3.3 Method of data collection
3.4 Problems of existing system or drawbacks identified in the present system
3.5 Data preparation
3.6 User preparation
3.7 Objective of the new design
3.8 Program structure
3.9 File maintenance module
3.10 Main menu specification
3.10.1 Output specification
3.10.2 Input specifications
3.10.3 File / database specification
3.11 Overview of the proposed system diagram
CHAPTER FOUR
System implementation
4.0 Introduction
4.1 Justification of the programming language
4.2 Program flowchart
4.3 System control
4.4 System requirement
4.4.1 Software requirement
4.4.2 Hardware requirement
4.4.3 People
4.5 Implementation detail
4.5.1 Coding
4.5.2 System testing
4.5.3 Training and re- training of staff
4.5.4 File conversion
4.5.5 System changeover procedure
4.5.6 Commissioning
4.5.7 User manuals
4.5.8 Maintenance details
Chapter five
Summary, recommendation and conclusion
5.1 Summary
5.2 Recommendation
5.3 Conclusion
References
Appendix
Get free samples of complete project topics and materials and list of project topics and materials
projects (2)
Adams Oshiomhole
advertisement
He has also criticised previous governments in the state for allegedly constructing hailed roads.
Oshiomhole, who disclosed this amount for the first time in a chance encounter with our correspondent said it was feat that must be accomplished through the regular payment of taxes and proper planning.
Oshiomhole spoke in Benin on Thursday night shortly after returning from Uzairue in Etsako West Local Government Area, where he inagurated the Ayogwiri-Apena Road project.
He said, "We are going to be firm in tax collection because with the construction going on everywhere, nobody will ask us why we are collecting taxes. We have done proper planning and we know what we required.
We have made adequate arrangement to fund the jobs as they come and I am very confident that we have made clear projections. For instance in the first qurater of the year, how much is required to do many of these jobs?
"We have specific commitments and as funds come, we already know what to do with them. So, you don't have the temptation of diverting resources to programmes that were not properly thought out. So, it is a deliberate approach to tie you to specific targets. We are not finished yet."
According to him, the state government is also focusing on education, health and rural electrification.
He called on the people to support the contractors handling the various projects, adding that the communities would benefit from them through job creation.
Asked to comment on his vision for Edo State in the years ahead, Oshiomhole replied. "This is not campaign time; by our actions, you will judge where we are going. It is action time and we are taking our time to design. Some of the roads done by our predecessors have already failed. Even at that, we are working on the basis of knowledge, not intuition."
Other ongoing road proejct are Ewohimi-Agadaga-Igueben road; Igueben-Ewohimi-Ohordua-Emu-Okhuesan road; and Isua-Arue-Uzenema-Egbele road.